NYC Renovation Case Study
Park Slope Bathroom Renovation (2021)
A completed Park Slope bathroom renovation with a rectangular freestanding tub, black double vanity, brass fixtures, warm-gray porcelain tile, and deep-blue textured feature tile.
Get Your Free On-Site EstimateThis 2021 Park Slope bathroom renovation pairs a rectangular freestanding tub and ceiling-mounted oval curtain track with a double black vanity, brass fixtures, warm-gray porcelain tile, and deep-blue textured wall tile. Comparable full NYC bathroom renovations now commonly plan around $45,000–$90,000+ and 5–9 weeks of construction, depending on plumbing, tile, building conditions, and custom selections.
The Project
A Park Slope Bathroom Built Around a Statement Tub and Double Vanity
The finished room combines a generous bathing area with useful two-person storage. A crisp rectangular tub anchors one side of the bathroom, while a black double vanity with a pale stone top gives the opposite side strong visual weight. Brass faucets, cabinet pulls, and slender metal legs add warmth without turning the room into a single-metal finish scheme.
Large warm-gray porcelain tiles continue from the floor up the lower walls, reducing visual breaks and providing a durable surface around the tub. Above them, narrow deep-blue textured tiles wrap the room and introduce color at eye level. A ceiling-mounted oval curtain track keeps the tub usable as a shower without placing a bulky frame on its clean edge.
Photo note: Every image on this page is an archived photograph of the completed 2021 Park Slope renovation. Current cost and timeline figures below are planning guidance for comparable work, not the private project invoice.
Completed Work
Completed Park Slope Bathroom Details
Archived project photographs show the freestanding tub, ceiling-mounted shower track, double black vanity, brass fixtures, warm-gray porcelain surfaces, and deep-blue textured feature tile.




Scope of Work
What the Park Slope Bathroom Renovation Involved
- Protection and selective demolitionProtect the home and work route, disconnect existing fixtures safely, and remove the finishes included in the approved renovation scope.
- Plumbing and electrical coordinationCoordinate the tub filler, hand shower, two vanity sinks, toilet, lighting, receptacles, and concealed rough-ins with the final fixture dimensions.
- Substrate and wet-area preparationRepair or rebuild walls and floors as required, prepare stable tile substrates, and complete wet-area protection before finish installation.
- Large-format porcelain tilePlan consistent joints and clean transitions across the floor and lower walls, including corners, plumbing penetrations, and the tub perimeter.
- Feature tile and finish carpentrySet the textured blue upper-wall tile, install the double vanity and stone top, and coordinate trim, hardware, and paint.
- Fixture installation and close-outInstall and test the tub, filler, hand shower, curtain track, toilet, faucets, lighting, accessories, and complete the final punch list.
Cost & Timeline
Current Planning Ranges for a Park Slope Bathroom
| Comparable scope | Current planning range | Construction time |
|---|---|---|
| Same-layout full bathroom renovation | $40,000–$60,000 | About 5–7 weeks |
| Premium tile, freestanding tub, and custom double vanity | $60,000–$90,000 | About 6–9 weeks |
| Layout changes or substantial structural and system work | $90,000+ | About 8–12+ weeks |
Final pricing depends on room size, demolition, concealed conditions, plumbing and electrical scope, tile labor, fixture selections, permits, access, and building requirements. Older Brooklyn homes should also carry a contingency for conditions that cannot be confirmed until finishes are opened. Design, approval, and procurement occur before the construction periods shown above.
Five Steps
How a Park Slope Bathroom Renovation Moves Forward
-
Survey the room and buildingMeasure the space and review plumbing, electrical capacity, ventilation, wall and floor conditions, access, and any management requirements.
-
Resolve layout and selectionsConfirm the tub, vanity, tile, fittings, lighting, accessories, and allowances before materials are ordered.
-
Complete approvals and protectionPrepare permits or building documents when required, coordinate shutoffs and deliveries, and protect the route to the bathroom.
-
Build in the correct sequenceMove from demolition and rough work through inspections, substrate preparation, waterproofing, tile, cabinetry, paint, and finish fixtures.
-
Test and close outCheck supply and drainage, fixture stability, electrical devices, grout and sealant joints, hardware, cleaning, and the final punch list.
Design & Planning
Why the Material Transitions Work
The room uses contrast in measured layers. Warm-gray porcelain provides a quiet, practical base; the textured blue tile begins at a consistent horizontal line; and the black vanity creates a darker focal point. Brass fittings then connect the vanity to the rest of the room without requiring every piece of hardware to match exactly. Planning the tile break, outlet positions, faucet drilling, and vanity height together prevents small misalignments from disrupting the composition.
A freestanding tub also requires more coordination than its simple shape suggests. The team must verify the filler location, service access, clearances, drainage, waterproofed surroundings, and how the shower curtain contains water. In older Park Slope properties, wall and floor conditions may only become fully visible after demolition, so the written scope should explain how concealed repairs and change authorization will be handled.
Explore our NYC bathroom renovation services, visit our Park Slope service-area page, browse more completed projects, or request a free on-site estimate.
Frequently Asked Questions
Park Slope Bathroom Renovation FAQs
How much does a bathroom renovation cost in Park Slope?
Comparable full Park Slope and NYC bathroom renovations commonly plan around $40,000–$90,000 or more. Room size, plumbing and electrical work, tile complexity, fixture quality, permits, access, and concealed conditions can change the total.
How long does a Park Slope bathroom renovation take?
Construction commonly takes about five to nine weeks after approvals and materials are ready. Layout changes, significant concealed repairs, inspections, limited work hours, and special-order products can extend the schedule.
Does bathroom work in Park Slope require permits?
Permit needs depend on the scope. Plumbing, electrical, ventilation, structural, and layout changes may require NYC filings, permits, inspections, and licensed trades. Interior work in a historic district is different from work that affects protected exterior elements.
Can a freestanding tub also work as a shower?
Yes, when the filler, handheld or shower outlet, waterproofed surfaces, drainage, clearances, and water containment are planned as one system. This project uses a ceiling-mounted oval curtain track around the tub.
What should be checked in an older Park Slope home?
The assessment should review plumbing and electrical service, ventilation, wall and floor stability, previous alterations, water damage, access, and the property or building rules. Some concealed conditions can only be confirmed after approved demolition.
Does WhiteStar renovate other bathrooms in Brooklyn?
Yes. WhiteStar provides full-scope bathroom, apartment, brownstone, and interior renovation services in Park Slope and across Brooklyn, Manhattan, Queens, and Staten Island, subject to project size and an on-site assessment.
Plan With Clear Numbers